BIM for Bridges February 2026

Click on the image to open the magazine as pdf

BIG OPEN BIM AS A NECESSITY FOR EFFECTIVE COLLABORATION ON TRANSPORT INFRASTRUCTURE PROJECTS
Ing. Pavel Vlasák; Ing. David Novák; Ing. Magdalena Křečková; AFRY

3D DIGITAL BRIDGE DESIGN, INTEGRATION AND MANAGEMENT – DANJIANG BRIDGE, TAIWAN
Allen Teng, Architect, Structural Engineering Department; Yih-Jer Lan, Engineer, Structural Engineering Department; Shun-Yuan Lin, Technical Manager, Structural Engineering Department; Wen-Tsung Chan, Vice President; Sinotech Engineering Consultants, Ltd.

INTEGRATION OF DANJIANG BRIDGE AND THE ENVIRONMENTAL SUSTAINABILITY
Rong-Ruey Lee, Technical Manager, Geotechnical Engineering Department; Chia-Ning Yang, Director of Watershed Solutions Centre, Hydraulic Engineering Department; Chen-En Chiang, Associate Vice President, Geotechnical Engineering Department; Sinotech Engineering Consultants, Ltd.

BRIEF OVERVIEW OF THE DANJIANG BRIDGE MONITORING SYSTEM
Magdaléna Sobotková

INTERVIEW WITH GREGOR STREKELJ; PRODUCT MANAGER CIVIL INFRASTRUCTURE, ALLPLAN
Magdaléna Sobotková

ADAPTIVE TRAIL BRIDGES: LINKING DISASTER RECOVERY WITH LONG-TERM COMMUNITY RESILIENCE IN KENYA
Robert Reese, P.E.; Peris Kahindi, Graduate Engineer, Bridging the Gap Africa